摘要 Coal seams in Tashan Mine of Datong Coal Group in China average 15 m thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 3.8 m and the top coal caving height was 11.2 m. The gateroad pillar between panels was 38 m. During retreat mining,serious bumps occurred in the gateroads on both sides of the pillar affecting safety production. Therefore,pillarless mining was experimented. Using numerical modeling and comparative study of cases of similar mining condition,it was decided to employ a 6 m wide pillar,rather than the previous 38 m wide pillar.Support system for the gateroads was designed and implemented. During gateroad development,pillar failure conditions and entry deformation were monitored. Hydraulic fracturing method was employed to cut off the K3 sandstone along the entry rib so as to reduce the abutment pressure induced during retreat mining. Support reinforcement method combining grouting and advanced reinforcement methods was proposed to insure stable gateroad ahead of mining. Methane drainage and nitrogen injection were implemented to eliminate hazards associated with mine fire and spontaneous combustion. Since the development of gateroad has just completed,and retreat mining has not begun,the effectiveness of the proposed methods is unknown at this point. However,monitoring will continue until after mining.The results will be published in a separate paper. Coal seams in Tashan Mine of Datong Coal Group in China average 15 m thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 3.8 m and the top coal caving height was 11.2 m. The gateroad pillar between panels was 38 m. During retreat mining, seri- ous bumps occurred in the gateroads on both sides of the pillar affecting safety production. Therefore, pillarless mining was experimented. Using numerical modeling and comparative study of cases of similar mining condition, it was decided to employ a 6 m wide pillar, rather than the previous 38 m wide pillar. Support system for the gateroads was designed and implemented. During gateroad development, pillar failure conditions and entry deformation were monitored. Hydraulic fracturing method was employed to cut off the K3 sandstone along the entry rib so as to reduce the abutment pressure induced during retreat mining. Support reinforcement method combining grouting and advanced reinforcement meth- ods was proposed to insure stable gateroad ahead of mining. Methane drainage and nitrogen injection were implemented to eliminate hazards associated with mine fire and spontaneous combustion. Since the development of gateroad has just completed, and retreat mining has not begun, the effectiveness of the proposed methods is unknown at this point. However, monitoring will continue until after mining. The results will be published in a separate paper.
出处 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第1期139-147,共9页 矿业科学技术学报(英文版)
基金 funded by the United Foundation key project fund,Chinese Natural Science Committee (No.U1261207) Datong Coal Group,Tashan Coal Mine,and supported by the Natural Science Foundation of Ningbo of China (No.U1261207)
关键词 Large mining heightSmall gateroad pillarTop coal caving longwall miningHydraulic fracturingGob-side entry driving 大采高综采 采区巷道 放顶煤 试验 煤柱 综采开采 无底柱采矿法 采动支承压力