期刊文献+

油气长输管道第三方破坏监测优化仿真研究 被引量:4

Simulation of Third-Party Damages to Long-Distance Oil and Gas Pipelines and Study on Damage Monitoring and Optimal
下载PDF
导出
摘要 油气管道第三方破坏是由于非管道员工行为导致的油气管道意外损坏,成为管道失效的主要形式,但除了造成严重损坏出现明显缺陷,甚至管道破裂泄漏事故直接更换管道之外,还没有行业标准指导修复和更换第三方破坏的管道。根据弹塑性力学和赫兹接触理论,采用有限元方法,建立挖掘机斗齿对X65管道斗齿-管道接触破坏过程模型,从斗齿不同作用角度和不同作用深度对管道破坏、损伤程度进行分析,模拟得到了油气管道的破坏形式和破坏机理;并通过管道残余应力分析,提出以管道外表面冲击坑深度为指标参数的管道更换建议方案,为第三方破坏管道修复和更换提供理论依据。 This paper took the X65 pipeline damage caused by excavator bucket teeth for an example. Based on the elastic-plastic mechanics and Hertz contact theory,the finite element model of bucket teeth-pipe contact failure process was established. The effects of different bucket teeth angles and depths on pipeline damages were analyzed.And the failure modes and failure mechanism of oil and gas pipelines were obtained by simulation. In addition,through the analysis of pipe residual stress,the pipe replacement suggestions with parameters of impact crater depth were put forward,providing some theory basis for the pipeline repair and replacement caused by the third-party damages.
出处 《计算机仿真》 CSCD 北大核心 2016年第2期469-474,共6页 Computer Simulation
基金 国家自然科学基金项目(51574198 51504207) 国家教育部博士点基金项目(20135121110005)
关键词 长输管道 第三方破坏 残余应力 冲击坑 Long-distance pipelines Third-party damages Residual stress Compact crature
  • 相关文献

参考文献18

二级参考文献149

共引文献188

同被引文献24

引证文献4

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部