摘要
Drainage canals are engineering structures widely used for debris flow mitigation.When passing through a drainage canal,debris flow usually scours the gully bed at the back of the rib sill of the drainage canal,which leads to failure of the rib sill.Therefore,the scour depth at the back of the rib sill is an important design problem and it is related to the economic benefits of engineering and service years.To explore the law of the depth of the scour pit after debris flow through drainage canal ribs,we first proposed a formula for the calculation of the maximum scour depth at the back of a rib sill based on energy conservation.We then conducted a series of simulation experiments to test the proposed formula.The experimental results show that the scour depth,trench slope and the distance between ribs all increase with a decrease in debris flow density.We then compared the results of experiments and formula calculations.Through the testing analysis,we found that the calculation results of the conductedformula correspond with the experimental results better.Finally,taking Qipan Gully as an example,we designed the ultimate depth of a drainage canal for debris flow using the calculation formula.
基金
financially supported by the key Projects of the Chinese Academy of Sciences (Grant No.KZZD-EW-05-01-04)
the National Science and Technology Support Program (Grant No.2012BAC06B02)
the sub-program of Science and technology research and development plan from China Railway (Grant No.2014G004-A-5)