施工度汛是水利水电等涉水工程建设的重要环节之一,关系到整个工程建设成败,具有很高的理论研究与工程实践价值。但施工度汛存在诸多不确定因素且因素间的关系复杂,度汛风险的量化分析与计算模型求解变得非常困难,近些年,国内外学者做了大量研究。综合已有文献,分别从施工度汛的分类、度汛标准、度汛风险量化计算模型研究进程和施工度汛经验这四大方面对其进行综述,并指出有待进一步研究的方向和内容。
Construction of the flood season is an important part of wading project construction such as water conservancy and hydropower,related to the success of the whole project construction,which has a high value in theoretical research and engineering practice.But it has many uncertainties and complex relationships between these factors,It becomes very difficult to quantitatively analysis the flood control of risk and solve computational model.In recent years,domestic and foreign scholars have done a lot of research.Integrating existing literature,we can conduct its review respectively from these four aspects such as construction of the flood season's classification、standard、risk quantification calculation model and experience,but also points the further research direction and content.
出处
《中国农村水利水电》
北大核心
2016年第2期157-160,共4页
China Rural Water and Hydropower
基金
国家自然科学基金资助项目(51379110)
湖北省教育厅重点项目(D20131301)
水电工程施工与管理湖北省重点实验室(三峡大学)开放基金(2014KSD02)
三峡大学2015年硕士学位论文培优基金(2015PY008)
关键词
水利水电工程
施工度汛
计算模型
water conservancy and hydropower project
construction flood-passing
classification
standard
calculation model