从大坝蓄水过程中大坝、工程边坡、泄洪建筑物等关键部位变形、应力应变、渗压渗流等方面介绍黄金坪水电站枢纽区监测仪器布设及安全监测成果。监测资料分析成果表明,大坝蓄水过程中枢纽区关键部位各类监测数据无异常变化,各建筑物运行良好。
The layout of monitoring equipments in project area of Huangjinping Hydropower Station and the monitoring data in water storage process are introduced from the aspect of deformation, stress, strain and seepage of dam, slope and flood releasing structure. The analyses on monitoring data show that there is no abnormal change in key structures during the process of water storage. Each structure is in good condition.
出处
《水力发电》
北大核心
2016年第3期44-46,共3页
Water Power
关键词
监测
分析
蓄水过程
黄金坪水电站
monitoring
analysis
water storage process
Huangjinping Hydropower Station