摘要
立足于装配式建筑的施工阶段,在施工实践的基础上用鱼刺图法系统归纳出施工阶段中影响质量的关键因素,并且对关键因素进行了细致的总结,在此基础上分析了针对质量因素的控制原则以及应当重点采取的各项技术经济措施,为施工方提高装配式建筑的施工质量提供了依据。
Based on the construction stage of the prefabricated concrete, the method of fish bone chart is used to systematically summarize the key elements that affect qualities, then, the key ele- ments are analyzed carefully. On such basis, the quality control principles as well as both economic and technical coping strategies will be proposed and analyzed on the elements in order to provide the construction side with the quality control basis of prefabricated concrete,
出处
《沈阳建筑大学学报(社会科学版)》
2016年第1期58-63,共6页
Journal of Shenyang Jianzhu University:Social Science
基金
辽宁省自然科学基金项目(201502794)
教育部人文社会科学研究规划基金项目(15YJA630001)
辽宁省教育厅人文社会科学研究项目(W2014084
W2014085)
沈阳市科学技术计划项目(F15-198-5-15)
关键词
构配件
装配式建筑
质量控制
施工方
component and fittings
prefabricated concrete
quality control
construction side