摘要
卡莫亚铜钴矿位于刚果(金)加丹加省利卡西市西部的坎博韦镇,受附近坎博韦矿常年疏干排水影响,区域地下水已处于超采状态,为满足卡莫亚铜钴矿未来开发的生产用水需求,该矿进行了供水水文地质勘探工作。本文将采用Mod Flow软件进行勘探区地下水流动模拟,计算地下水补给资源量,并预测未来水源地运行情况。
Kamoya copper deposit is located in Katanga Town,the west part of Lilasi Province,Congo( Kinshasa). The regional groundwater has been over exploited due to the yearly dewatering of Kambove Mine nearby. In order to satisfied the water demand for the future development of Kamoya copper and cobalt mine,a water supply hydrogeological exploration work is carried out. The software Mod Flow is used to simulate the groundwater flow,calculate the amount of groundwater recharge,and predict the future water supply.
出处
《工程勘察》
2016年第3期42-46,共5页
Geotechnical Investigation & Surveying