摘要 综合体育馆工程一层的设计中,顶梁板采用型钢混凝土结构,但受现场施工条件限制,型钢梁无法采用传统安装方案,只能分段制作运输至施工现场。本文介绍的方案中研究了将这些型钢吊运至超高大模板支撑平台,再滑移至安装位置后组装成整体,采用手拉倒链起吊安装就位的可行性。经专家论证,方案可行,已在项目中实施,成效优异。 General gymnasium engineering design layer, the top slab using steel reinforced concrete structure, but is limited on-site construction conditions, steel beam can not use the traditional installation program, only block production transported to the construction site.This paper describes the research program of the lifting of these steel to ultra-large formwork support platform, and then slide to move to the installation position after assembled into a whole, the feasibility of hand chain hoists leave in place.By experts, is feasible, has been implemented in the project, outstanding results.
作者 姜志根
出处 《建筑技术开发》 2016年第1期35-38,共4页 Building Technology Development
关键词 综合体育馆 条件限制 型钢梁 组合吊装 comprehensive gymnasium conditions confine steel girder group hoisting
  • 相关文献

参考文献1

二级参考文献3

共引文献2

同被引文献12

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部