基于TOPSIS的联合体总承包项目利益分配 被引量:4

Allocation of Stakeholders Based on TOPSIS Method with Consortium Project
下载PDF
导出
摘要 联合体总承包项目中,各参与方出于自身利益考虑,可能导致合作伙伴的利益受到损害,由此导致项目的失败。因此,解决项目成员的利益冲突,对利益进行协调和分配,是项目成功进展的基础。联合体成员在利益分配时,各利益相关方偏好不同的利益分配方案,文章通过对可能影响利益分配的四要素投入、风险、贡献及努力水平进行分析,建立不同的利益分配模型。运用TOPSIS方法,确定了不同利益分配方式的权重,折中形成一种综合的分配方案,协调核心利益相关者的利益分配。 Consortium as general contractor,the parties involved for their own interests,may lead to damage to the interests of partners,which led to the failure of project implementation. So,conflicts of interest of project members,coordination and distribution of interests,is the basis for success of the project progress. Members of the Commonwealth during the distribution of benefits among stakeholders prefer a different distribution of benefits programs,the article establishes the distribution of benefits of different models by analyzing four factors that may affect the distribution of the benefits. Using TOPSIS method to determine the weight of different benefits distribution compromising to form a comprehensive plan for the distribution.
机构地区 河海大学商学院
出处 《土木工程与管理学报》 北大核心 2016年第2期95-99,共5页 Journal of Civil Engineering and Management
基金 江苏省自然科学基金(BK20130847) 江苏省社会科学基金(13EYD026)
关键词 联合体制 利益相关者 利益分配 TOPSIS consortium stakeholders distribution of benefits TOPSIS
  • 相关文献

参考文献7

二级参考文献53

共引文献176

同被引文献43

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部