摘要
从结构设计和接口设计两方面,阐述了以行车指挥为主的有轨电车综合自动化平台方案。该方案基于系统工程理论,将行车管理、运营综合监控、设备维护、网络管理等功能集成到一个统一的平台上,实现各系统之间的信息互通和资源共享,高效实现各系统之间的联动,从而提高有轨电车服务质量和服务水平。目前,该建设方案已逐步在多条有轨电车线路中采用。
The construction of a tram integrated automation platform scheme based on traffic command( TIAS) are described from structure design and interface design aspects. This scheme integrates the traffic management( TM),integrated supervision and control system( ISCS),device management system( DMS) and network management system( NMS) etc. into a unified platform, in order to achieve information exchange,resource sharing and efficient linkage between each system,and improve the tram service quality and service level for passengers. At present,the construction scheme has been gradually adopted on many operation tram lines.
出处
《城市轨道交通研究》
北大核心
2016年第4期34-37,41,共5页
Urban Mass Transit