期刊文献+

水库突发事件应急预案可行性评价方法再研究 被引量:6

Further studies of feasibility evaluation method for reservoir emergency preparation plan
下载PDF
导出
摘要 目前,我国水库突发事件应急预案普遍存在可行性不强、可行性评价技术不过关的问题,难以在技术层面监督指导应急预案的编制工作,一定程度上影响了水库突发事件应急预案的实施。已有大坝突发事件应急预案可行性评价方法初步研究中,由于指标体系的不完备,可行性评价具有显著灰色特征,为减弱指标体系不完备带来的灰色特征的影响,有必要研究新方法以降低指标体系不完备对评价结果的影响。基于水库突发事件应急预案可行性评价的已有研究成果,考虑到可行性指标体系的不完备性等灰色特征,建立了基于灰色关联度的可行性评价方法,通过案例模拟验证了可行性评价方法的实用性。该方法完善了已有水库突发事件应急预案可行性评价技术,降低了可行性指标体系不完备等灰色特征对评价结果准确性的不利影响。 At present,the feasibility of the emergency preparation plan( EPP) for dam reservoirs is uncertain; and the appraisal technology of EPP feasibility is still inadequate,which leads to difficult supervision of EPP making and in some extent affects the EPP making and relevant enforcement work. In the researches on EPP appraisal methods which have been studied by other experts and scholars,EPP feasibility appears to have a notable characteristic that comes from index incompleteness. This incompleteness can affect the implement results of EPP feasibility appraisal. In order to reduce the effects given by the index incompleteness,it is necessary for us to carry out studies of new appraisal methods for EPP feasibility. Based on the existing research findings of reservoir EPP feasibility evaluation methods, considering a gray feature in the feasibility evaluation system with the index incompleteness,a new evaluation method is established based on a grey correlation degree,and its availability is verified through the simulation of case histories. This method is used to improve reservoir EPP feasibility evaluation technology and reduce the impact extents for the evaluation results considering the incompleteness of the feasibility index system.
出处 《水利水运工程学报》 CSCD 北大核心 2016年第2期83-88,共6页 Hydro-Science and Engineering
基金 水利部公益性行业科研专项(201501033 201201051) 南京水利科学研究院基金资助项目(Y915001 Y715016 Y715013)
关键词 水库 突发事件 应急预案 可行性 灰色关联度 reservoir emergency event emergency preparation plan(EPP) EPP feasibility grey correlation degree
  • 相关文献

参考文献11

  • 1全国应急预案体系建设情况调研报告[J].中国应急管理,2013(1):8-11. 被引量:15
  • 2RAMABRAHMAM B V, SREENIVASULU B, MALLIKARJUNAN M M. Model on-site emergency plan. Case study: toxic gas release from an ammonia storage terminal[J]. Journal of Loss Prevention in the Process Industries, 1996(4) : 259-265.
  • 3JENKINS L. Selecting scenarios for environmental disaster planning[ J]. European Journal of Operational Research, 2000, 121 (2) : 275-2886.
  • 4RAMABRAHMAM B V, SWAMINATHAN G. Disaster management plan for chemical process industries. Case study: investigation of release of chlorine to atmosphere [ J ]. Journal of Loss Prevention in the Process Industries, 2000, 13 ( 1 ) : 57- 62.
  • 5YUKO NAKANISHIY. Assessing emergency preparedness of transit agencies : A foucus on performance indicators [ C ]// The 82nd Annual Meeting of the Transportation Research Board, Washington, D C, January, 2003.
  • 6AIEXANDER D. Towards the development of a standard in emergency planning[ J]. Disaster Prevention and Management, 2005, 14(2) : 158- 175.
  • 7程翠云,钱新,万玉秋,盛金保,李雷.水库大坝突发事件应急预案可行性评价方法初探[J].水利水运工程学报,2009(1):71-75. 被引量:15
  • 8程翠云,钱新,杨珏,李雷,万玉秋,杨孟.溃坝应急预案有效性评价[J].岩土工程学报,2008,30(11):1729-1733. 被引量:14
  • 9唐玮,姜传胜,佘廉.提高突发事件应急预案有效性的关键问题分析[J].中国行政管理,2013(9):51-54. 被引量:26
  • 10周克发,王晓航.贵州松柏山水库、花溪水库大坝突发事件应急预案[R].1版.南京:南京水利科学研究院,2009.

二级参考文献29

共引文献59

同被引文献56

引证文献6

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部