顶管管节壁后触变泥浆探地雷达探测研究 被引量:7

Application of GPR to Detect Thixotropic Clay Slurry outside the Tube of Pipe Jacking
原文传递
导出
摘要 采用探地雷达对顶管顶进中管节壁后触变泥浆进行探测,通过对雷达探测图像的数据处理及解译测得触变泥浆的相对介电常数,获得管节壁后触变泥浆套的分布状况。结果表明:管节壁后泥浆套厚度并非均匀一致,但沿顶进方向能够形成致密的泥浆套且其厚度为理论建筑空隙厚度的8~17倍,而实际施工中泥浆套厚度为建筑空隙的6~7倍时即能达到同样的减摩效果,本次雷达探测能够优化顶管施工质量;此外,通过与盾构隧道管片壁后注浆进行对比发现:电磁波在顶管触变泥浆中的传播速度明显小于其在盾构隧道浆液的传播速度,浆液的含水量及水化速度是影响电磁波在介质中传播速度的关键。 The thixotropic clay slurry outside the tube of pipe jacking was detected by the Ground Penetrating Radar( GPR). The thickness distribution of thixotropic clay slurry was obtained by the collected radar detection image after data processing,interpretation and the propagation velocity of electromagnetic wave in clay slurry derived from dielectric property test for thixotropic clay slurry samples. The results show that although the thickness of clay slurry was inconsistent in different sections,clay slurry could be formed along the longitudinal tube,and the thickness of the slurry detected was 8 to17 times of the thickness of the building gap,however,the anti-friction effect could be achieved when the ratio was 6 to 7, this radar detection realized the function to optimize the pipe jacking construction. In addition,the velocity of electromagnetic wave in clay slurry of pipe jacking is significantly slower when compared with the grouting behind the segment of shield tunnel,meanwhile the water content and hydration speed of slurry are the key factors which influence the velocity of electromagnetic wave.
出处 《地下空间与工程学报》 CSCD 北大核心 2016年第2期477-483,共7页 Chinese Journal of Underground Space and Engineering
基金 教育部长江学者和创新团队发展计划(IRT1029)
关键词 探地雷达 顶管 泥浆套 盾构隧道 电磁波传播速度 ground penetrating radar(GPR) pipe jacking clay slurry shield tunnel the velocity of electromag neticwave
  • 相关文献

参考文献7

二级参考文献22

  • 1黄宏伟,刘遹剑,谢雄耀.盾构隧道壁后注浆效果的雷达探测研究[J].岩土力学,2003,24(S2):353-356. 被引量:57
  • 2张龙.大口径钢管顶管注浆减阻技术的改进[J].市政技术,2006,24(2):110-112. 被引量:14
  • 3杜军,黄宏伟,谢雄耀.注浆材料介电常数在雷达图像识别中的应用[J].岩土力学,2006,27(7):1219-1223. 被引量:8
  • 4余彬泉 陈传灿.顶道施工技术[M].北京:人民交通出版社,1998.53-54,163-166.
  • 5[2]GB 50268-97,给水排水管道工程施工及验收规范[S].
  • 6[2]马谢尔勒.顶管工程[M].北京:中国建筑工业出版社,1983.
  • 7[3]李世忠.钻探工艺学[M].北京:地质出版社,1991.
  • 8Jancsecz S, Steiner W. Face support for a large mix-shield in heterogeneous ground conditions[A]. Tunnelling 94, conference proeedings, Institution of Mining and Metallurgy and British Tunnelling Society[C]. London: Chapman and Hall, 1994. 531 -549.
  • 9Jefferis S A. Slurrids, Grouts. Chapter 48 of Construction Materials Reference Book[M]. Doran D K. Oxford:Butterworth- Heinemann, 1992.
  • 10Anagnostou, G. and Kovari, K. Face stability in slurry and EPB shield tunneling[J]. Tunnels and Tunnelling, 1996, 28(12): 27-29.

共引文献228

同被引文献47

引证文献7

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部