摘要
大型煤化工企业的生产会产生大量的含盐废水,蒸发塘是一种低能耗的处理高含盐废水的设施。本文从蒸发塘设计的自然条件出发,确定工艺流程和蒸发塘工艺尺寸,计算水量平衡,讨论现存问题。
The operation of large-scale coal chemical enterprise will produce large amounts of saline wastewater,and evaporation pond is a low energy consumption facility for high salinity wastewater treatment. From the point of view of natural conditions of evaporation pond design,this paper defines the process flow and process dimensions of evaporation pond,and calculates the water balance as well as discusses the existing problems.
出处
《化工设计》
CAS
2016年第2期11-14,36,共5页
Chemical Engineering Design
关键词
煤化工
浓盐水处理设施
蒸发塘
水平衡计算
工艺设计
coal chemical industry
concentrated salt water treatment facility
evaporation pond
water balance
calculation process design