摘要 The paper discussed about the staged construction analysis of two-span precast-girder bridge considering time dependent effects, namely creep and aging of concrete. Results obtained showed that it is very important to consider construction stage in the analysis of bridge because of stress resultants which are important in design process and very different from those obtained without the consideration of construction stage. This fact is especially important for bridges, because construction period continues along time and loads may change during the construction period and after.
出处 《Journal of Civil Engineering and Architecture》 2016年第4期447-451,共5页 土木工程与建筑(英文版)
关键词 Staged construction analysis reinforced concrete bridge. 混凝土桥梁 施工分析 分段 数值 预制 混凝土的徐变 时间相关 施工阶段
  • 相关文献

参考文献5

  • 1Mari, A. R. 2000. "Numerical Simulation of the Segmental Construction of Three Dimensional Concrete Frames." Eng. Struct. 22 (2000): 585-96.
  • 2Ketchum, M. A. 1986. Redistribution of Stresses in Segmentally Erected Prestressed Concrete Bridges. Report No. UCB/SESM-86/07, Department of Civil Engineering, University of California, Berkeley.
  • 3Computers and Structures Inc. 2008. SAP2000, Integrated Finite Element Analysis and Design of Structures. California: Computers and Structures Inc.
  • 4Cruz, P. J. S., Mari, A. R., and Roca, P. 1998. "Nonlinear Time-Dependent Analysis of Segmentally Constructed Structures." d. Struct. Eng. 124 (3): 278-88.
  • 5CEB (Comite Euro-International du Beton). 1990. CEB-FIP Model Code. London: Thomas Telford Ltd.