海洋石油201水下管汇在线安装极限能力评估 被引量:2

HYSY 201 Work Capacity Assessments on In-Line Manifold Installation
下载PDF
导出
摘要 水下管汇在线安装是指将水下管汇、海底管道终端、三通等结构物在铺管船作业线上与管道连接,并随管道通过托管架安装到海底的过程。结合海洋石油201船特性,根据其几何限制、能力极限条件及管道强度要求等,针对水深、管径、结构物湿重及长度对海洋石油201船的水下管汇在线安装的极限能力进行评估,并形成极限能力包络线。采用OrcaFlex通用有限元软件,分析过程分为裸管分析、关键位置筛选分析、详细静态分析以及结果后处理。已知设计基础数据包括水深、管道外径和壁厚、水下管汇长度和湿重,通过查阅海洋石油201船的水下管汇在线安装能力包络线,对水下管汇的安装方案做出预判,为工程实践提供参考。 In-line manifold installation means that manifold, PLET or in-line Tee is connected to pipeline on the fireline and then installed by stinger to seabed. Combined with characteristics of HYSY 201 ,within its geometry limitation, capacity limitation and strength capacity of pipeline, capacity assessment on in-line manifold installation is carried out, and then capacity envelope curve is generated about water depth, diameter of pipeline, wet weight and length of in-line manifold, provided reference for engineering practice. OrcaFlex software is adopted. Analysis procedure includes pure pipeline analysis, critical position screening analysis, detailed static analysis and resuits post process. Based on given design basic data including water depth, diameter and wall thickness of pipeline, wet weight and length of in-line manifold, by referring to capacity envelope curve,the installation schemes of subsea manifold can be estimated.
出处 《石油矿场机械》 2016年第5期1-7,共7页 Oil Field Equipment
基金 工业信息化部海洋工程装备科研项目"水下生产系统设计及关键设备研发"(E-0813C003)
关键词 水下管汇 在线安装 铺管船 极限能力评估 subsea manifolcl in-line installation pipe-laying barge capacity assessment
  • 相关文献

参考文献5

二级参考文献46

  • 1周承倜,马良.海底管道屈曲及其传播现象[J].中国海上油气(工程),1994,6(6):1-8. 被引量:11
  • 2闫澍旺,肖智旺,田英辉.单重保温管海底管线在铺设状态的层间剪力分析[J].海洋技术,2005,24(2):89-92. 被引量:4
  • 3Dixon D A, Rutledge D R. Stiffened catenary calculations in pipehne laying problem[J]. ASME, Journal of Engineering for Industry, 1968, 90(2) : 153 - 160.
  • 4Pahner A C, Hutchinson G, Ells J W. Configuration of submarine pipelines during laying operations[J]. ASME, Journal of Engineering for Industry, 1974, 96(11):1112- 1118.
  • 5顾永宁.海底管线铺管作业状态分析.海洋工程,1988,6(2):11-23.
  • 6Glaus G F, Saroukh A. Interaction between vessel, stinger, and pipeline during laying operations in high seas[C]//15th International Conference on Offshore Mechanics and Arctic Engineering. 1996, 5:179- 186.
  • 7Zhu D S, Cheung Y K. Optimization of buoyancy of an articulated stinger on submerged pipelines laid with a barge[J]. Ocean Engineering, 1997, 24(4) :301 - 311.
  • 8Guarracino F, Mallardo V. A refined analytical analysis of submerged pipelines in seabed laying[J]. Applied Ocean Research, 1999, 21(6) :281 - 293.
  • 9Wilkins J R, Mcdermott J R. Offshore pipeline stress analysis[C]// Second Annual Offshore Technology Conference. Houston: [s. n. ], 1970,5:OTC1227.
  • 10Offshore Standard DNV- OS- F101 [ S]. Norway: Det Norske Veritas, 2007.

共引文献56

同被引文献21

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部