摘要
以国内某铜冶炼厂为例,分析了该铜冶炼厂铜阳极泥中碲回收项目的工艺选择、设备选型及厂房配置等的工程实践。项目建成后,预计每年产碲锭21 t,经济效益良好。
Based on a tellurium recovery project from copper anode slime of a copper smelting plant, this paper analyzes the process of tellurium recovery, equipment selection and plant arrangement. After the completion of the project, the output of tellurium is 21 t/a, which has a good economic benefit.