TianshengqiaoⅠcascade and Ⅱ cascade hydropower stations completely built up
-
1Xuanwei Power Plant 5th Phase Project was completely built up[J].Electricity,2001(4):51-51.
-
2National installed capacity and electricity generation by province (as of December 31, 2004)[J].Electricity,2005,16(4):59-59. 被引量:1
-
3Hunan Lingjintan Hydropower Station put into operation[J].Electricity,2001(1):50-50.
-
4By Zuo Xiaowen,Chu Xue (译).Analysis on Operation Reliability of Generating Units in 2005[J].Electricity,2007,18(2):34-41.
-
5All the 330 kv Yulin-Shenmu power transmission and substation projects completed[J].Electricity,2001(1):49-49.
-
6China's hvdropower installed capacity exceeded 77,000 MW[J].Electricity,2001(1):49-49.
-
7Data on National Electric Power Production (as of December 31, 2004)[J].Electricity,2005,16(4):57-57.
-
8Cascade hydropower stations on Yellow River enters vigorous generation[J].Electricity,2007,18(2):8-8.
-
9Antonio Carlos Padoan Jr.,Christophe Nicolet,Basile Kawkabani,Jean-Jacques Simond,Alexander Schwery,Francois Avellan.Stability Study of a Mixed Islanded Power Network[J].Journal of Energy and Power Engineering,2014,8(8):1449-1459.
-
10Data on National Power Supply and Consumption (as of December 31, 2004)[J].Electricity,2005,16(4):57-57.