摘要
铁路实施货运组织改革以来,通过分析广州铁路(集团)公司接卸车存在问题,以及货运能力不足、到卸量能不匹配、点线能力制约、施工影响突出等因素对接卸车能力的影响,从加强货运组织、运输组织、信息化系统建设和推进扩能改造项目等方面,提出提升接卸车能力的对策。
From the view of implementing railway freight transport organization reform, through analyzing the problems existing in train receiving and unloading of Guangzhou Railway(Group) Corporation and the influences on train receiving and unloading capacity by the factors like insufficient freight transport capacity, mismatching between arrival unloading volume and its capacity, restricted point-line capacity and obvious influence of construction, this paper puts forward countermeasures on increasing train receiving and unloading capacity from the aspects such as strengthening freight transport organization, transportation organization and establishment of informationization system and promoting capacity-expansion and reconstruction project.
出处
《铁道货运》
2016年第5期43-48,共6页
Railway Freight Transport
基金
广州铁路(集团)公司科技研究开发计划课题(2013K08)
关键词
铁路
接卸车能力
货运组织
Railway
Train Receiving and Unloading Capacity
Freight Transport Organization