昆明南站大型十字转圆钢柱抗震转换节点分析及施工技术 被引量:4

Analysis and Construction of Seismic Transfer Joints in Large Cross to Circle Steel Column in South Kunming Station
下载PDF
导出
摘要 云南为地震多发地区,昆明南站高架候车层梁柱节点由下部大型十字型钢骨转换为圆钢柱,经过有限元分析及三维BIM设计,在十字下节柱和圆管型上节柱之间连接一个中空的转换节点,节点外围有钢筋混凝土环梁包裹。这种结构的转换节点不仅截面过渡性好,而且应力集中现象不明显,结构设计能满足现行国家和铁路规范9度抗震的要求。另外,对工程中的施工难点及关键施工技术进行了研究,并采取了针对性的解决措施,取得了良好的效果。 Yunnan province is an earthquake prone area. The beam-column at the waiting layer in the South Kunming Station is a large cross to circle steel column,which is connected by the hollow transfer joint in the bottom cross column and the top circle column. The outer of the joint is enveloped by reinforcement concrete. This transfer joint not only has smooth transitional character,but also has little concentrated stress. The joint structure can meet the requirement for nine degree earthquake in the related standards. In addition, the construction difficulties and key construction technologies are researched and some solutions are put forward,which gains good effect.
作者 韩锋
出处 《施工技术》 CAS 北大核心 2016年第10期14-17,65,共5页 Construction Technology
基金 中国铁建股份有限公司科研课题(LX11-06-03)
关键词 钢骨柱 抗震 转换节点 环梁 有限元分析 施工技术 steel reinforced column seismic transfer joint ring beam finite element method construction
  • 相关文献

参考文献3

  • 1张剑,刘畅,檀传江,等.连通式钢管混凝土柱与钢筋混凝土梁刚性节点没计及有限元分析【c]//第三届全国建筑结构技术交流会,2011.
  • 2陈建航,李剑沼,张春辉.广交会大厦钢结构高效加工技术[J].建筑工程技术与设计.2014(31):79-80.
  • 3黄炎中.大型劲性混凝土环梁施工技术[C]//2003年全国桥梁学术会议,2003.

共引文献1

同被引文献34

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部