摘要
提出了在配电变压器高压侧加装并联电容以进行无功补偿并辅助限制雷电过电压的技术措施,并通过ATP-EMTP软件进行了仿真分析。
The technical measures for installing parallel capacitors on the high voltage side of distribution transformer to reactive power compensation and auxiliarg limitation of lightning overvoltage,and the simulation analysis is carried out by ATP-EMTP software.
作者
林新杰
咸日常
咸日明
崔聪
荣庆玉
LIN Xin-jie;XIAN Ri-chang;XIAN Ri-ming;CUI Cong;RONG Qing-yu(School of Electrical and Electronic Engineering,Shandong University of Technology,Zibo 250000,China;Shandong Huineng Electric Co.,Ltd.,Zibo 250000,China)
出处
《变压器》
北大核心
2019年第9期38-43,共6页
Transformer