基于FAHP法钢箱梁斜拉桥主梁施工方案比选 被引量:7

Construction Planning Decision of Steel Box Girder Bridge Based on FAHP Method
下载PDF
导出
摘要 建立钢箱梁斜拉桥主梁施工方案优化排序的数学模型,对西安富裕路沣河大桥3种施工备选方案进行比选.通过实地调研和文献查阅完成专家调查表.因FAHP考虑了人脑决策时的模糊性,可以提高结果的客观和准确程度,故采用FAHP法计算各备选方案的权重,最终确定选择最优施工方案. The construction optimization mathematical model of the steel box girder of cable-stayed bridge is established to make comparison of the three kinds of construction alternatives of Xi'an Fenghe Bridge.Through on site investigation and literature materials consulting to complete the exporters'research charts,using FAHP method to calculate the weight of each alternative option,and the optimum construction scheme is finally determined.
出处 《沈阳大学学报(自然科学版)》 CAS 2016年第3期237-243,共7页 Journal of Shenyang University:Natural Science
关键词 FAHP 钢箱梁 斜拉桥 施工方案比选 FAHP steel box girder cable stayed bridge comparison and selection of construction schemes
  • 相关文献

参考文献6

二级参考文献24

  • 1姚敏,系统工程,1997年,15卷,2期
  • 2张跃,模糊数学方法及其应用,1992年
  • 3许树柏,层次分析法原理,1988年
  • 4陈明宪.斜拉桥建造技术[M].北京:人民交通出版社,2003..
  • 5李国豪,项海帆.中国桥梁[M].上海:同济大学出版社,1993.
  • 6M·S.特罗伊茨基(m.S.Troitsky).斜拉桥理论与设计[M].北京:中国铁道出版社,1980.
  • 7小沃尔特·波多尔奈(Walter Podolng),约翰B.斯卡尔兹(John B·Scalzi).斜拉桥设计与施工[M].北京:中国建筑工业出版社,1980.
  • 8Russell H. Beautiful Thing. Bridge Design and Engineering,1999.
  • 9陈明宪.铜陵长江公路大桥设计施工技术总结[M].北京:人民交通出版社,2000.
  • 10项海帆,范立础.中国桥梁五十年回眸,http://www.nxzz.com/cai/qiao/cnq150.htm

共引文献1962

同被引文献60

引证文献7

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部