摘要 为满足高转速机组的水电形势需求,提高水轮发电机性能,针对现有技术存在的不足,从降低水轮发电机电压谐波畸变率、电话谐波含量,改善水轮发电机运行稳定性,提高水轮发电机运行效率等指标要求出发,介绍了一种水轮发电机磁极极靴五段弧结构,着重分析该结构设计特点与方法,通过参数分析研究了各参数间的关联性以及各段弧之间的连接关系,最后通过实际案例分析了磁极极靴五段弧结构的有效性。 In order to meet the development requirements of hydroelectric power of highspeed unit and improve the performance of hydro-generator,this paper introduces a 5-arc structure of hydro-generator magnetic pole shoe from aspects of reducing voltage waveform distortion and telephone harmonic content,improving operational stability and increasing operational efficiency to overcome the shortcomings of existing technology,emphatically analyzes characteristics and method of structural design,researches correlations among the parameters and connection relationships among the arcs through analyzing parameters and finally proves effectiveness of 5-arc structure of magnetic pole shoe based on actual examples.
出处 《防爆电机》 2016年第3期8-11,共4页 Explosion-proof Electric Machine
关键词 水轮发电机 转子磁极 五段弧极靴 极靴设计 Hydro-generator magnetic pole of rotor 5-arc magnetic pole shoe design of pole shoe
  • 相关文献

参考文献5

二级参考文献11

  • 1陈文添.水轮发电机组转子一点接地的分析与查找[J].广西电力,2005,28(3):26-29. 被引量:14
  • 2张裕三.水轮发电机油雾及防治.大电机技术,2002.No7.
  • 3何光超,王胜五,张俊江.广东省长湖水电厂2号机组推力轴承油槽安装油挡装置的技术改造.大电机技术,2002.No7.
  • 4黄晓东.广州蓄能水电厂Ⅱ期机组轴承甩有问题处理及改进设想.大电机技术,2002.No7.
  • 5贺蕴谷.立轴式水轮发电机轴承油槽甩油的治理.大电机技术,2002.No7.
  • 6徐刚.云峰发电厂1号水轮发电机推力轴承甩油处理.大电机技术,2002.No7.
  • 7哈尔滨大电机研究所.水轮发电机设计与计算.北京:机械工业出版社,1982.
  • 8吴延滨.大型发电机定转子接地保护运行分析[J].大电机研究所,2009.2.
  • 9陶瑞基,黄春明,吴贝,袁超.发电机转子动态接地故障的处理[J].电气应用,2011,30(16):91-93. 被引量:1
  • 10陈俊,谈涛,王光,张琦雪,严伟,沈全荣.发电机转子绕组接地故障定位功能的商榷[J].电力系统自动化,2011,35(21):31-33. 被引量:13

共引文献18

同被引文献18

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部