电缆网络数字化管理系统建设及其应用 被引量:8

Construction and Application of Cable Network Digital Management System Author
下载PDF
导出
摘要 随着城市建设快速发展,电缆线路及沟道迅猛增加。与此同时,光缆以其众多优点被越来越多的应用于有线通信的各个领域,通信光缆在城市电网电缆沟道内随处可见。电缆沟道及沟道内光缆、电缆运维矛盾日益突出。为了解决公司地下管道及电力电缆(光缆)管理中存在的问题和不足,文中详细介绍了电缆网络数字化管理系统建设方案及组成和功能。建设电缆网络数字化管理系统承担着国家电网公司试点任务,通过在西安地区的试点应用,实现了现场电力电缆(光缆)的快速身份识别,提升移动巡检数据的规范性。 ABSTRACT:The number of power cable line and trench increases rapidly with the development of urban construction. At the same time,the optical cable is more and more widely used in various fields of wired communication,communication cable can be seen everywhere in the city power network cable channel. Cable channel and channel cable,cable operation and maintenance contradiction is increasingly prominent. In order to solve the problems and deficiencies in the management of underground pipelines and power cable (cable), this paper introduces the construction scheme,composition and function of the digital management system of cable network. Through the pilot application in Xi’an area,the fast identification of the power cable (optical fiber cable)is realized,and the standard of mobile data is promoted.
出处 《电网与清洁能源》 北大核心 2016年第4期75-78,共4页 Power System and Clean Energy
关键词 电力电缆 电子标签 智能移动终端 数字化管理 power cable radio frequency identification intelligent mobile terminal digital management
  • 相关文献

参考文献3

二级参考文献20

  • 1刘静.110kV及以上电力线对通信光缆的影响分析[J].广西电力,2007,30(1):65-67. 被引量:3
  • 2GB50217-2007电力工程电缆设计规范[S].
  • 3速水敏幸[日].电力设备的绝缘诊断[M].刘晓萱译.北京:科学出版社,2003.
  • 4CIGRE WG 21-09. Consideration of Ageing Factors in Extruded Insulation Cables and Accessories [R].1992.
  • 5CIGRE WG 21-05. Diagnostic Methods for HV Paper Cables and Accessories [R].1998.
  • 6CIGRE WG 21-16. Partial Discharge Detection in Installed Extruded Cable Systems [R].2001.
  • 7BS EN 60885-3:2003,Electrical Test Methods for Electric Cables -Part 3 :Test Methods for Partial Discharge Measurements on Lengths of Extruded Power Cables[S].
  • 8HEIZMANN T,ASCJWAMDEM T. On-Site Partial Discharge Measurements on Premoulded Cross-Bonding Joints of 170 kV XLPE and EPR Cables [J] . IEEE Trans.on Power Delivery, 1998,13(2):330-335.
  • 9OHKI Y. Present Stage of Partial-Discharge Monitoring Technique in After-Laying Tests for Extra-High Voltage XLPE Cable Lines [J]. IEEE Electrical Insulation Magazine, 2000, 16(1) : 74-76.
  • 10IEEE400.3TM-2006:Guide for Partial Discharge Testing of Shielded Power Cable Systems in a Field Environment[S].

共引文献21

同被引文献87

引证文献8

二级引证文献60

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部