摘要 离网运行的光伏与储能系统的投资,即所需安装的光伏和储能的容量,不仅取决于用户负荷需求的大小,而且与用户对供电可靠性的要求以及系统的控制策略密切相关.为合理计及可靠性成本,通过用户停电损失指标把可靠性货币化,不仅可以通过该指标确定负荷的供电优先级,而且便于以总成本最小为目标进行优化规划.提出了一种具有时间前瞻性的控制策略,该策略的特点是:在储能充电阶段进行前瞻性充电,以保证储能可以在放电阶段向供电优先级高的负荷供电,使用户总成本最小;通过嵌套全生命周期Monte Carlo模拟的广度优先搜索策略,迅速锁定最优规划方案.通过算例证明了所提控制策略的优势和规划方法的有效性. The investment in standalone photovoltaic and energy storage system,or the required installation capacity of photovoltaic and energy storage,is affected by many factors.Customer's demand size is an obvious factor,while the power supply reliability requirement and system control strategy are also important but easily overlooked factors.Firstly,to account for the reliability cost reasonably,customer outage cost is selected to monetize reliability index in the paper.In this way,the load priority is decided naturally,hence laying a solid foundation for the optimal planning whose target is minimizing the total cost.Then,a novel control strategy with prospective timing is put forward.With the strategy,storage system is charged prospectively during the charging stage to ensure that the high priority load can be supplied.In doing so,customer's total cost is minimized.Lastly,breadth-first search nested by life-cycle Monte Carlo simulation is used to pick up the best planning scheme.A case study is conducted to verify the effectiveness of planning method and the advantage of control strategy.
作者 余贻鑫 孙冰
出处 《天津大学学报(自然科学与工程技术版)》 EI CSCD 北大核心 2016年第5期443-449,共7页 Journal of Tianjin University:Science and Technology
基金 国家高技术研究发展计划(863计划)资助项目(2015AA050403)
关键词 离网光伏与储能系统 用户停电损失 优先级 时间前瞻性 全生命周期Monte CARLO模拟 优化规划 standalone photovoltaic and energy storage system customer outage cost priority prospective timing life-cycle Monte Carlo simulation optimal planning
  • 相关文献

参考文献7

二级参考文献97

  • 1刘柏私,谢开贵,马春雷,徐德超,周家启,周念成.复杂中压配电网的可靠性评估分块算法[J].中国电机工程学报,2005,25(4):40-45. 被引量:121
  • 2徐大明,康龙云,曹秉刚.基于NSGA-Ⅱ的风光互补独立供电系统多目标优化[J].太阳能学报,2006,27(6):593-598. 被引量:38
  • 3U.S. Department of Energy. The Smart Grid:An intro- duction DE-AC 26-04NT41817. SUBTASK 560. 01. 04 [EB/OL]. http://www, energy, gov.
  • 4余贻鑫,栾文鹏.面向21世纪的智能电网[N].科学时报,2010-09-06.
  • 5U. S. Department of Energy. Final Report on the August 14,2003 Blackout in the United States and Canada: Causes and Recommendations [R]. U. S. -Canada Power System Outage Task Force,U. S. Department of Energy, Washington, D C,2004.
  • 6Union for the Coordination of Transmission of Electric-ity. Final Report-System Disturbance on 4 November 2006. January [EB/OL]. http .//www. ucte. org.
  • 7Amin M, Schewe P F. Preventing blackouts:Building a smarter power Grid[J]. Scientific American,2008:60- 67.
  • 8Federal Energy Regulatory Commission. Assessment of Demand Response and Advanced Metering[R]. Staff Report,Docket AD-06-2-000,2006.
  • 9Federal Energy Regulatory Commission. A National Assessment of Demand Response Potential [R]. Freeman,Sullivan and Co. and Global Energy Partners, LLC,2009.
  • 10The BC Energy Plan:A Vision for Clean Energy Leader- ship [EB/OL]. http-//ec, europa, eu/research/energy/pd f/smartgrids_en, pdf, 2008-10-10.