摘要 针对断层构造处围岩难以控制问题,采用数值模拟、理论分析及现场实测等方法,分析了断层构造处矿压显现规律及围岩控制措施。现场实测表明,总体上巷道变形在允许范围以内,不影响安全和生产,超前支护取得了良好的支护效果。 Aiming at the problem that surrounding rock is difficult to control at the fault structure, numerical simulation, theoretical analysis and in-situ monitoring were carried out for analyzing the mine pressure behave law at the fault structure and the control measures of surrounding rock. In-situ monitoring shows that the overall deformation of roadway is within the scope of the permit, which ensures the safety production, advanced support has obtained the good effect.
出处 《煤炭技术》 CAS 北大核心 2016年第7期85-87,共3页 Coal Technology
基金 中国矿业大学煤炭资源与安全开采国家重点实验室自主研究课题资助项目(SKLCRSM12X01)
关键词 大采高 断层 围岩控制 数值模拟 high mining height fault surrounding rock control numerical simulation
  • 相关文献

参考文献11

二级参考文献81

共引文献992

同被引文献20

引证文献4

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部