期刊文献+

提高桃源水库砌石重力坝埋石率的措施 被引量:1

Measures for increasing buried stone rate of masonry gravity dam at Taoyuan Reservoir
下载PDF
导出
摘要 砼砌石重力坝是水利水电工程使用较为广泛的坝型。能够就地取材、节省投资、节约"三材",具有明显的经济性。砼砌石重力坝中埋石率的控制是大坝施工质量和成本控制的重要因素。以桃源水库工程砼砌石重力坝为例,探讨提高砼砌石重力坝中块石比例的技术措施,从而提高砌石重力坝埋石率,保证工程质量,降低工程成本。 As a dam type widely adopted by water conservancy and hydropower project, concrete masonry gravity dam permits obtaining raw materials locally, less cost and less material consumption of cement, steel and wood. For construction of a masonry gravity dam, the control of buffed stone rate is important for construction quality and cost. Taking the construction of the masonry gravity dam of Taoyuan Reservoir as example, the author discussed the technical measures for increasing the proportion of stone and the buffed stone rate, so as to guarantee construction quality and reduce cost.
作者 张剑敏
出处 《广西水利水电》 2016年第3期51-54,共4页 Guangxi Water Resources & Hydropower Engineering
关键词 砼砌石重力坝 坝体砌筑 埋石率 桃源水库 Concrete masonry gravity dam dam body building buried stone rate Taoyuan Reservoir
  • 相关文献

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部