期刊文献+

基于ANSYS对丰满水电站重建工程溢流坝预应力闸墩优化方案的研究 被引量:8

ANSYS-based study on optimal scheme for prestressed pier of overflow dam for Fengman Hydropower Station Reconstruction Project
下载PDF
导出
摘要 应用大型结构计算软件ANSYS,对丰满重建工程溢流坝预应力闸墩进行三维有限元模拟计算与分析。通过从锚索吨位、次锚索位置、空腔措施、锚块尺寸以及锚块底部与闸墩接触方式等方面开展研究,对预应力闸墩进行优化分析,从而改善闸墩的受力状态,提高预应力效果。同时为有关预应力闸墩研究提供了参考依据。 With large structural calculation software ANSYS, the 3 - D FEM simulative calculation and analysis are made on the prestressed pier of the overflow dam for Fengman hydropower Station Reconstruction Project. Through the studies carried out in the aspects of the main anchor cable tonnage, the secondary anchor cable position, the cavity arrangement, the anchor block size, the mode of the contact between both the bottom of the anchor block and the pier, etc. , a optimized analysis is mad on the prestressed pier, and then not only the stress state of the pier is improved, but its prestressed effect is also enhanced. Mean- while, a reference basis is laid for the relevant study on prestressed pier as well.
出处 《水利水电技术》 CSCD 北大核心 2016年第6期80-83,87,共5页 Water Resources and Hydropower Engineering
关键词 丰满水电站重建工程 预应力闸墩 三维有限元分析 优化分析 Fengman hydropower Station Reconstruction Project prestressed pier 3 -D finite elementanalysis optimization a- nalysis
  • 相关文献

同被引文献61

引证文献8

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部