摘要 郑州新郑国际机场二期扩建工程T2航站楼钢结构屋盖采用大面积网架结构体系。采用分析软件MIDAS对主楼屋盖网架施工全过程进行模拟分析。研究内容包括屋盖网架提升过程模拟分析、钢结构合龙与卸载分析、提升支撑架设计计算等。施工全过程模拟计算按照预定的施工方案分步实施,对施工方案进行优化与辅助设施的设计提供可靠的依据。 Main building's steel roof of Zhengzhou Xingzheng International Airport terminal T2 uses steel grid structure system. In this paper,the analysis software MIDAS is used to simulate the whole process of the construction of the main roof of the main building. The research contents includes grid roof ascension process simulation analysis,the steel structure closure and unloading analysis,support the lifting rack design etc. The whole course simulations are carried step by step according to the established construction plan,which provides a reliable basis for the optimization of construction scheme and the design of auxiliary facilities.
出处 《施工技术》 CAS 北大核心 2016年第14期27-30,共4页 Construction Technology
关键词 钢结构 施工模拟 提升 卸载 steel structures construction simulation lifting unloading
  • 相关文献

参考文献4

二级参考文献22

共引文献91

同被引文献49

引证文献9

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部