摘要
包西铁路建设项目点多、线长,征地拆迁工作量大、涉及面广、问题复杂。为保证征地拆迁进度,按时完成工程目标,文章分析了包西铁路建设项目征地拆迁工作所面临的形势及存在的问题,总结了包西铁路征地拆迁工作的成功经验,可供类似工程参考。
Baotou-Xi'an railway construction project had many sites with a long line. The workload of land expropriation and housing removal was heavy and complicated. In order to guarantee the schedule of project, this paper analyzed the situation and existing problems of land expropriation and housing removal for Baoxi railway, and summed up the experiences. It could be taken as reference for similar projects.