3Chen B.A Communication Platform to Facilitate Knowledge Transfer between Different Stakeholder Groups in Sustainable Building Desians[D1.Sheffield. Sheffield School of Architecture 2009.
4Caneparo LShared virlual reality for design and management: the Porto Susa project[J]~Automation in Construction. 2001 (10) : 217-228.
5Manoharan T. Taylor H,and Gardiner P.Interactive urban development control with collaborative virtual environments[C]//The Seventh International Conference on Virtual Systems and Multimedia (VSMM' 01). 2001.pp809.
6Campbell D A.and Wells M.A critique of virtual reality in the architectural design pfocess[R/OL]//University of Washington: The HITL Lab Technical Report R-94-3. http: //www.hitl.washington. edu/publications/r-94-3/ 2011-08-02.
7Frost ffand Warren P.Virtual Architectural Design Process[C] Conference on Information Visua proceeding. 2000.pp568 Reality Used in a Collaborative // The Fourth International sation {IV' 00) conference.
8Ganah A.. Anumba C.J.and Bouchlaghem N.M.Computer visualisation as a communication tool in the construction industry[C]// The Fifth Inlernalional Conference on Information Visualisation (IV' 01 ) conference proceeding. 2001.pp679.
9Staub-Frech S.and Fischer M.Industrial case study of electronic design cost. and schedule integration[R].Technical Report vo112. Stanford: Centre for Integrated FaciLity Engineering. 2001.
10Zhang J.P.. Ma Z.Y.and Pu C.4D visualizaon of construction site management[C]// The Fifth International Conference on Information Visualisation (IV' 01) conference proceeding, 2001. pp382-387.