期刊文献+

洋山四期工程供电系统创新应用 被引量:2

Innovative application of power supply system for Yangshan deepwater port phase Ⅳ project
下载PDF
导出
摘要 洋山四期工程供电系统广泛应用了新技术、新产品、新材料、新工艺。如:过电压保护装置选用六柱全相双安全保护装置,为设备更加可靠、安全的运行提供了保障;使用DEHN系列接地夹具不但给施工带来了便利,而且更易于控制施工质量;采用烙克赛克穿隔密封系统有效解决了电缆密封和日后的扩容问题。 New technology, new product, new material, new process are widely used in the power supply system of Yangshan deepwater port phase IV project. For example, the over-voltage protector with dual safety protection device for all phases in six posts guarantees more reliable and safe operation of the equipment; the use of DEHN series earth clamp not only facilitates the construction, but also ensures easy control of construction quality; the roxtec cross sealing system effectively solves the problem of cable sealing and future expansion.
出处 《水运工程》 北大核心 2016年第9期163-166,共4页 Port & Waterway Engineering
关键词 创新应用 过电压保护装置 接地线连接方法 电缆密封解决方案 innovation application over-voltage protection device grounding wire connecting method cable sealing solution
  • 相关文献

参考文献4

  • 1GB50169-2006电气装置安装工程接地装置施工及验收规范[S].
  • 2GB/T50065-2011.交流电气装置的接地设计规范[S].
  • 3GB/T21714.3-2015雷电防护.第3部分:建筑物的物理损坏和生命危险[S].
  • 4IEC62561,l一2012避雷系统组件(LPSC).第1部分:连接组件的要求[S].Switzerland:IECCentralOffice,2012.

共引文献51

同被引文献12

引证文献2

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部