鉴于挤压边墙施工技术具有施工工艺简单、施工成本低、方便施工管理等优点,结合板涧河水库大坝挤压边墙施工的实际情况,介绍了挤压边墙的施工工艺及施工质量控制要点,为挤压边墙的设计及应用积累经验。
The concrete extrusion sidewall is a new technique in the construction of concrete face rock-fill dams. It has a number of advantages such as construction simplicity, low cost, and construction management convenience. Based on the practical construction experience of the concrete extrusion sidewall of the Banjianhe Reservoir dam, the extrusion sidewall construction technique and keypoints of the quality control are introduced. It could be useful experience for the design and application of the concrete extrusion sidewall construction technique.
出处
《水电与新能源》
2016年第9期13-15,共3页
Hydropower and New Energy
关键词
板涧河水库
挤压边墙
施工技术
Banjianhe reservoir
extrusion side wall
construction technique