鄂尔多斯金牛煤电铁路专用线接轨方案 被引量:1

Junction Plan of Railway Industrial Siding of Ordos Jinniu Coal and Electricity Company
下载PDF
导出
摘要 鄂尔多斯金牛煤电铁路专用线接轨于高关支线高头窑站,途经高头窑矿区、城梁矿区至城梁装车站。针对接轨方案分别提出高头窑站接轨方案、罕台川站接轨并行塔韩铁路方案、罕台川站接轨绕行方案和刘家梁站接轨方案4种方案,并且针对高头窑接轨方案局部路段分别制订绕行方案和隧道方案2个局部比较方案,通过综合比选,提出采用高头窑站接轨绕行方案较为合理。 Railway industrial siding for Ordos Jinniu coal and electricity is in junction with Gaoguan line of Gaotouyao Station, by passing Gaotouyao ore district, Chenliang ore district, and terminates at Chenliangzhuang Station. This paper puts forward with four junction plans including Gaotouyao Station junction plan, Hantaichuan Station junction plan in parallel with Tahan Station, Hantaichuan Station junction and detouring pan, and Liujialiang junction plan, and designs two comparative plans of detouring plan and tunnel plan targeting at section of Gaotouyao junction plan. Through comprehensive comparison and selection, the paper adopts the more reasonable Gaotouyao Station junction and detouring plan.
作者 杨艳
出处 《铁道货运》 2016年第9期10-14,共5页 Railway Freight Transport
基金 内蒙古铁道勘察设计院科研项目(内铁设2012-W40)
关键词 铁路专用线 选线 矿区 局部比选 Railway Industrial Siding Location Selection Ore District Local Comparison
  • 相关文献

参考文献3

二级参考文献8

  • 1赵月霞.铁路建设与城市环境[J].铁道经济研究,2005(4):44-46. 被引量:7
  • 2中华人民共和国铁道部.GB50090-2006铁路线路设计规范[S].北京:中国铁道出版社,2006.
  • 3中华人民共和国铁道部.TB10003-2005铁路隧道设计规范[S].北京:中国铁路出版社,2005.
  • 4中华人民共和国铁道部.TB10082-2005铁路轨道设计规范[S].北京:中国铁道出版社,2005.
  • 5中华人民共和国铁道部.铁路工程设计技术手册[M].北京:中国铁道出版社,1994.
  • 6铁道第一勘察设计院集团有限公司.新建铁路精伊线预可行性研究总说明[R].兰州:铁道第一勘察设计院集团有限公司,2002.
  • 7铁道第一勘察设计院集团有限公司.新建铁路精伊线可行性研究总说明[R].兰州:铁道第一勘察设计院集团有限公司,2003.
  • 8魏永宏.提高列车平均总重的措施探讨[J].铁道运输与经济,2011,33(10):17-19. 被引量:1

共引文献131

同被引文献1

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部