摘要
鄂尔多斯金牛煤电铁路专用线接轨于高关支线高头窑站,途经高头窑矿区、城梁矿区至城梁装车站。针对接轨方案分别提出高头窑站接轨方案、罕台川站接轨并行塔韩铁路方案、罕台川站接轨绕行方案和刘家梁站接轨方案4种方案,并且针对高头窑接轨方案局部路段分别制订绕行方案和隧道方案2个局部比较方案,通过综合比选,提出采用高头窑站接轨绕行方案较为合理。
Railway industrial siding for Ordos Jinniu coal and electricity is in junction with Gaoguan line of Gaotouyao Station, by passing Gaotouyao ore district, Chenliang ore district, and terminates at Chenliangzhuang Station. This paper puts forward with four junction plans including Gaotouyao Station junction plan, Hantaichuan Station junction plan in parallel with Tahan Station, Hantaichuan Station junction and detouring pan, and Liujialiang junction plan, and designs two comparative plans of detouring plan and tunnel plan targeting at section of Gaotouyao junction plan. Through comprehensive comparison and selection, the paper adopts the more reasonable Gaotouyao Station junction and detouring plan.
出处
《铁道货运》
2016年第9期10-14,共5页
Railway Freight Transport
基金
内蒙古铁道勘察设计院科研项目(内铁设2012-W40)
关键词
铁路专用线
选线
矿区
局部比选
Railway Industrial Siding
Location Selection
Ore District
Local Comparison