澳门轻轨高架连续刚构桥节段预制拼装施工及控制 被引量:4

Construction and control of segmental precast assembly for continuous rigid frame viaduct in Macao LRT
下载PDF
导出
摘要 澳门轻轨1号线高架桥穿越凼仔岛中心区域,路线十分复杂,跨径类型繁多,上部结构采用短线匹配法预制和提梁机悬臂拼装新型施工工艺。文章阐述了施工及控制的关键技术。实践表明,节段预制拉装技术在城市高架曲线桥梁中适应性良好,对既有交通干扰少,施工效率高。 The viaduct of Macao LRT line 1 passes through the central region of TAIPA, the route is very complicated and thespan type is various. Its upper structure adopt new construction techniques of short-line matching prefabrication and cantilevererection by erection crane. We introduced the key technology of construction and control. The practice has proved that thesegmental precast assembly technology has good applicability in the urban viaduct curved bridge, less disturbance to theexisting traffic, and high construction efficiency.
作者 祁向宇 QI Xiang-yu(China Civil Engineering Construction Corporation, Beijing 100038, China)
出处 《中国港湾建设》 2016年第10期69-72,共4页 China Harbour Engineering
关键词 轻轨高架 连续刚构 节段预制拼装 提梁吊机 施工控制 light rail viaduct continuous rigid frame segmental precast assembly erection crane control technology
  • 相关文献

参考文献5

二级参考文献16

共引文献95

同被引文献20

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部