成兰铁路跃龙门隧道H_2S整治措施的探讨 被引量:12

Discussion on Control Measures for H_2S in Yuelongmen Tunnel on Chengdu-Lanzhou Railway
下载PDF
导出
摘要 为了解决铁路隧道施工及运营期间有害气体H2S的危害,通过对H2S产生原因、隧道内分布特征和危害情况的分析,采用工程类比和理论计算的研究方法,得出施工期加强超前探测、加强通风稀释和制定专项劳动保护措施,运营期采用水气分离排放的处理方案,从而确保隧道施工和运营安全。 The causes,distribution characteristics and damage of H_2S to railway tunnel construction and operation are analyzed. The engineering comparison and theoretical calculation are carried out. A series of technologies,including strengthening advance detection,strengthening ventilation and making professional labor protection measures during tunnel construction and water-gas separation discharge method during tunnel operation,are adopted. The safety of tunnel construction and operation can be guaranteed by using above-mentioned technologies.
作者 周跃峰 李传富 宋贵明 ZHOU Yuefeng LI Chuanfu SONG Guiming(China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031, Sichuan, China)
出处 《隧道建设》 北大核心 2016年第10期1251-1257,共7页 Tunnel Construction
关键词 铁路隧道 H2S 通风 封闭 排放 railway tunnel H2S ventilation sealing discharge
  • 相关文献

参考文献15

二级参考文献48

共引文献36

同被引文献125

引证文献12

二级引证文献109

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部