针对工程设计阶段的投资控制专题,阐述了投资控制工作的制度化建设和投资控制工作的分阶段实施。关于投资控制工作的制度化建设,主要从强化工程设计人员的经济意识、提高设计质量、建立概预算台帐管理制度、建立工程限额设计任务书制度、采用优化设计确保达到限额设计的指标及与业主充分沟通等六个方面进行阐述。关于投资控制工作的分阶段实施,主要从投资控制工作的分阶段实施、初步设计概算阶段的投资控制工作、施工图预算阶段的投资控制工作三个方面进行了阐述。
Aiming at the investment control of engineering design stage, the article sets forth the institutionalization construction of investment control work and the phased implementation of investment control work.On the institutionalization construction of investment control work, the article sets forth mainly from six aspects of strengthening the economic consciousness of engineering designers, improving the design quality, establishing the budget accounting management system, setting up the engineering quota design task book system, and using the optimized design in order to ensure to achieve the quota design indexes and fully to communicate with the owners. On the phased implementation of investment control work, the article sets forth three aspects of the phased implementation of investment control work, the investment control work of preliminary design financial estimation stage, and the investment control work of construction drawing budget stage.
出处
《城市道桥与防洪》
2016年第11期112-113,140,共3页
Urban Roads Bridges & Flood Control
关键词
工程投资
设计阶段
投资控制
限额
engineering investment
design stage
investment control
quota