浅谈引水泵房基础施工工艺 被引量:2

On construction technology of water pump room foundation
下载PDF
导出
摘要 引水泵站基础施工应综合考虑工程地质与水文条件、基坑开挖深度、降排水措施、钢板桩位移监控要求、土方开挖流程和施工工期要求等多方面因素,通过多种分析选择合理方案,并对施工工艺进行优化,使方案可操作性强、风险低。 Engineering geological and hydrological condition, foundation pit excavation depth, draining measures, steel sheet pile displacement monitoring requirements, earthwork excavation process and construction time requirements as well as factors in other aspects should be comprehensively considered in water pump station foundation construction. Rational plan is selected through various analysis, and construction technology is optimized, thereby the plan is strongly practical with low risk.
作者 甘龙文
出处 《水利建设与管理》 2016年第8期20-23,共4页 Water Conservancy Construction and Management
关键词 引水泵房 基础 多次开挖 施工工艺 water pump room basis various excavation construction technology
  • 相关文献

参考文献5

二级参考文献2

  • 1GB50007-2002.建筑地基基础设计规范[S].[S].北京:中国建筑工业出版社,2002..
  • 2龚晓南.地基处理手册[R].第三版.北京:中国建筑工程工业出版社,2008.

共引文献17

同被引文献11

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部