摘要
引水泵站基础施工应综合考虑工程地质与水文条件、基坑开挖深度、降排水措施、钢板桩位移监控要求、土方开挖流程和施工工期要求等多方面因素,通过多种分析选择合理方案,并对施工工艺进行优化,使方案可操作性强、风险低。
Engineering geological and hydrological condition, foundation pit excavation depth, draining measures, steel sheet pile displacement monitoring requirements, earthwork excavation process and construction time requirements as well as factors in other aspects should be comprehensively considered in water pump station foundation construction. Rational plan is selected through various analysis, and construction technology is optimized, thereby the plan is strongly practical with low risk.