期刊文献+

一种组立特高压钢管塔的智能平衡力矩抱杆

A Smart Balance Moment Derrick of UHV Transmission Towers
下载PDF
导出
摘要 随着1 000 kV特高压交流输电技术的大规模发展,特高压双回路钢管塔在工程建设中得到了广泛应用。针对锡盟—山东特高压工程双回路钢管塔高度高、重量大、横担长等特点,基于安全和施工便利等多方面考虑,创新研究应用下顶升智能平衡力矩抱杆,有效解决钢管塔组立难题,提升组塔施工效率及安全水平。 With the rapid development of 1 000 kV UHV engineering construction, double circuit steel tube tower has been widely used in engineering. Double circuit power steel towers used in Ximeng-Shandong UHV engineering have characteristics of high altitude, heavy weighty and large length for the cross ann. Based on considerations of safety and convenient construction, the jack-up smart balance moment derrick is applied, which can solve the steel pipe tower assemble problem effectively, and enhance the efficiency and safety of assemblage tower construction.
出处 《山东电力技术》 2016年第7期60-64,共5页 Shandong Electric Power
关键词 智能抱杆 钢管塔 特高压 smart derrick steel tube tower ultra-high voltage
  • 相关文献

参考文献5

二级参考文献20

  • 1孙大同.送电线路大跨越高塔施工方法和分析[J].浙江电力,1995(6):10-14. 被引量:4
  • 2李庆林.特高压输电线路铁塔组立抱杆的方案选择[J].电力建设,2007,28(3):29-33. 被引量:43
  • 3Q/GDW 155-2006 1 000 kV架空输电线路铁塔组立施工工艺导则[S].
  • 4田子恒.750 kV线路铁塔钢铝混合抱杆的研制.超高压送变电动态报道,2006,4.
  • 5高压架空输电线路施工技术手册一起重运输部分.水利电力出版社,1975.
  • 6GB/T13752-1992塔式起重机设计范[S].
  • 7GB5144-94.塔式起重机安全规程[S].[S].,..
  • 8广东省电力工业局.架空送电线路岗位技能培训教材[M].北京:中国电力出版社,1993.
  • 9建筑施工手册编写组.建筑施工手册[M].2版.北京:中国建筑工业出版社,1988.
  • 10Q/GDW 153—2006 1 000 kV架空送电线路施工及验收规范[S]. 北京:中国电力出版社,2007.

共引文献48

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部