摘要
针对安庆铜矿部分难采矿体选择合理采场结构参数的复杂条件,结合层次分析法(AHP)和逼近理想解序法(TOPSIS),提出构建AHP-TOPSIS综合评判指标模型。综合考虑影响采场结构参数的3项指标,运用AHP法解出各项指标权重,再配合TOPSIS法建立综合评价模型,从9种备选方案中,确定方案Ⅶ(矿房45 m,矿柱15 m,阶段高60m)为最优,推荐方案在矿山生产实践中取得了良好效果。
According to the complex conditions of trouble- some orebody for selecting the reasonable structure parame- ters of stope in Anqing copper mine, an AHP- TOPSIS comprehensive evaluation index model was put forward based on the analytic hierarchy process (AHP) and TOPSIS method. Three indicators influencing structure parameters were considered comprehensively, and their weight was cal- culated by AHP method. Moreover, the evaluation model was established by TOPSIS method. Finally, the scheme Ⅶ, with 45 m of chamber, 15 m of pillar and 60 m of level, was determined as the optimal method from 9 schemes, which obtained good effect in mine production.
作者
邹雄刚
张耀平
熊伟
蔡汉玉
ZOU Xionggang ZHANG Yaoping XIONG Wei CAI Hanyu(School of Resources and Environmental Engineering, Jiangxi University of Science and Technology, Ganzhou, Jiangxi 341000, China College of Applied Science, Jiangxi University of Science and Technology, Ganzhou, Jiangxi 341000, China)
出处
《矿业研究与开发》
CAS
北大核心
2016年第11期1-5,共5页
Mining Research and Development
关键词
采场结构参数
评价指标
层次分析法
逼近理想解序法
评判模型
Stope structure parameters, Evaluation index,Analytic hierarchy process (AHP), Close to the ideal solu-tion sequence method, Evaluation model