针对某发电有限责任公司HG-2080/17.5-YM9锅炉在进行脱销系统和脱硫系统增容改造后出现的问题,通过风烟系统特性试验,研究了引风机满足不了额定负荷运行条件下,如何进行引风机改造参数的确定。
Problems arise after the SCR system and desulfurization system of a HG - 2080/17.5 - YM9 boiler in a power generation company were upgraded for capacity extension. In vie"w the problems, how to identify the reformation parameters of induced fan is studied based on characteristic test of air-flue gas system.
出处
《山西电力》
2016年第6期58-61,共4页
Shanxi Electric Power
关键词
引风机
风烟系统
特性试验
改造参数
induced fan
air-flue gas system
characteristic test
reformation parameters