摘要
BIM(建筑信息模型)技术的发展使建筑领域产生了第二次变革,但BIM技术在地下输电工程的结构设计中应用较少。基于国家电网项目中即墨站220 k V地下输电工程,以输电网中的工作井为研究对象,在BIM建模软件Revit中建立了工作井模型族库,实现参数化建立工作井的BIM模型,并将模型导入结构分析软件Robot中进行计算分析。该项目实现了工作井设计及计算的批量化操作,提高了设计人员的工作效率。
The development of BIM(Building Information Model) technology has made the second change in the construction field,but the application of BIM technology in the structure design for underground power transmission project is less. Based on the 220 k V Jimo power transmission project from National Grid,the work wells built by the software which contain BIM technology is the center of the study. The parameterized model was built by Revit and the parameters could be modified to build BIM model. The BIM model was sent to Robot to do the analysis. The batched design of the work wells was realized in the project. The efficiency of the design can be highly improved by using BIM technology.
作者
陈明
史健勇
Chen Ming Shi Jianyong(School of Naval Architecture, Ocean & Civil Engineering, Shanghai Jiao Tong University, Shanghai 200240, Chin)
出处
《工业建筑》
CSCD
北大核心
2016年第12期196-200,共5页
Industrial Construction
关键词
BIM
参数化
地下输电工程
工作井
结构设计
BIM
parameterization
underground power transmission project
work well
structure design