期刊文献+

千岛湖配水工程对钱塘江河口盐水入侵影响 被引量:2

Effects of Qiandao Lake water diversion project on Qiantang River estuary saltwater intrusion
下载PDF
导出
摘要 杭州市第二水源千岛湖配水工程(简称配水工程)的实施将引起富春江水库下泄流量及过程改变,从而对钱塘江河口盐水入侵产生影响。建立考虑涌潮作用的二维盐度数值模型,在验证钱塘江河口潮位和盐度的基础上,预测配水工程实施对河口盐水入侵距离和重要取水口含氯度超标时间的影响。研究表明:配水工程实施后,上游富春江水库若按现状调度方案,对枯水年影响大,咸水上溯距离增加3.7km,沿岸取水口的可取水时间缩短0.2~3.6d,丰、平水年盐水入侵和引水前相当;通过水库的优化调度,可基本消除枯水年引水造成的盐水入侵影响。为减少配水工程实施的盐水入侵影响,采用水库的优化调度模式是必要的。 Qiandao Lake water diversion project will change the runoff process of the Fuchun reservoir and the salini- ty of Qiantang River estuary. A two-dimensional numerical salinity model which including tidal bore's action is estab- lished. Based on tide and salinity testing, the distance of saltwater intrusion and the exceeding period of important wa- ter inlets caused by the project are calculated. Results showed that, it will be significantly effected in the low flow year by the current scheduling scheme, the distance of saltwater intrusion is increased 3 700 meters and time available for water inlets time along the river is shorten 0.2-3.6 days, but it is little effected in normal and high flow year. In or- der to reduce the influence of the salt water intrusion which happened due to the project in low flow year, a reservoir optimal operation is necessary.
作者 张舒羽 周维 史英标 ZHANG Shuyu ZHOU Wei SHI Yingbiao(Zhejiang Tongji Vocational College of Science and Technology, Hangzhou 310000, China Zhejiang Institute of Hydraulics and Estuary, Hangzhou 310020, China)
出处 《水科学进展》 EI CAS CSCD 北大核心 2016年第6期876-882,共7页 Advances in Water Science
基金 国家自然科学基金资助项目(51379190)~~
关键词 河口 盐水入侵 超标时间 千岛湖 钱塘江 配水工程 estuary saltwater intrusion exceeding period Qiandao Lake Qiantang River water diversion project
  • 相关文献

参考文献10

二级参考文献90

共引文献140

同被引文献23

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部