某综合管廊关键节点局部开大洞对结构受力性能的影响

Effect of a Big Hole in a Key Node of Utility Tunnel on Stressing Property of Structure
下载PDF
导出
摘要 通过对某综合管廊关键节点的三维模型及二维平面模型分析的对比,给出在中板开大洞时平面计算模型如何简化较为合理,可为设计人员提供设计依据。 According to the analysis and comparison of 3D model and 2D model of a key joint of a utility tunnel,the article introduces how to simplify and be more reasonable for the plane calculation model if there is a big hole in the floor,which can provide the basis for the designers.
作者 唐甜甜
出处 《城市道桥与防洪》 2017年第1期161-164,共4页 Urban Roads Bridges & Flood Control
关键词 综合管廊 开大洞 三维模型 二维模型 utility tunnel big hole 3D model 2D model
  • 相关文献

参考文献3

二级参考文献9

  • 1祝龙根,陈正杰.上海、广州地铁衬砌水平整环试验测试分析报告[R].上海:同济大学,上海市隧道工程轨道交通设计研究院,2000.
  • 2Hiroshi Nakamura,Toshikazu Kubota,Mamoru Furukawa,Tsutomu Nakao. Unified construction of running track tunnel and crossover tunnel for subway by rectangular shape double track cross - section shield machine EJ]. Tunneling and Underground Space Technolo- gy,2003, ( 18 ) : 253 - 262.
  • 3李德强.综合管廊设计与施工[M].北京:中国建筑工业出版社,2009.
  • 4总参工程兵科研三所.GB50108--2008地下工程防水技术规范[S].北京:中国计划出版社,2008.
  • 5GB50838-2012,城市综合管廊卫程技术规范[s].
  • 6.上海市政工程设计研究总院(集团)有限公司,同济大学.GB50838--2015城市综合管廊工程技术规范[s].北京:中国计划出版社,2015.
  • 7北京城建设计研究总院有限责任公司,中国地铁工程咨询有限责任公司.C.B50157--2013地铁设计规范[s].北京:中国建筑工业出版社,2013.
  • 8电力规划设计总院.DIZI5484--2013电力电缆隧道设计规程[S].北京:中国计划出版社,2013.
  • 9王如路,宋博,王祺,郑彬.双圆盾构隧道衬砌错缝拼装整环试验及结构分析[J].地下工程与隧道,2001(1):12-15. 被引量:29

共引文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部