期刊文献+

国家风光储示范电站黑启动中风机启动失败原因及对策分析 被引量:1

Cause of generator startup failure during black-start of national wind/photovoltaic/energy-storage pilot station and its countermeasure
下载PDF
导出
摘要 对风光储电站黑启动的试验过程中风机并网过程进行了分析。首先,重点分析了风机启动造成储能变流器跳闸的原因,并对风机参与黑启动的过程进行了仿真验证,指出由于风机缺少恰当的软启动过程,导致启动过电流,使得黑启动失败;然后,提出了风机参与黑启动过程中直流电压软启动的控制策略;最后,通过仿真对所提控制策略进行了验证,表明所提方法能够很好地避免风机变流器的启动过电流问题。 The grid-connection process of wind turbine during the black-start of a wind / photovoltaic / energystorage station is analyzed. The cause of energy-storage converter trip due to the wind turbine startup is emphatically analyzed and the black-start process with wind turbine is simulated,which verifies that,the wind turbine startup overcurrent due to the lack of proper soft-startup process results in the black-start failure. The control strategy for the soft-startup of DC voltage is proposed for the black-start with wind turbine,which is verified by simulation,showing that the startup overcurrent of wind turbine converter is effectively avoided.
出处 《电力自动化设备》 EI CSCD 北大核心 2017年第2期50-53,60,共5页 Electric Power Automation Equipment
关键词 黑启动 永磁直驱风机 风光储电站 储能变流器 风电 并网 软启动 black-start permanent magnet direct-drive generator wind/photovoltaic/energy-storage power station energy-storage converter wind power grid-connection soft-startup
  • 相关文献

参考文献17

二级参考文献314

共引文献611

同被引文献15

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部