摘要
土方量计算是工程建设当中一项经常性而又不可缺少的工作。本文通过南方CASS软件提供的三种土方量计算方法,对试验对象进行计算,得出相应的土方量并进行分析,同时对方格网法土方量计算精度进行了理论分析。由于土方量计算原理不同,导致三种方法各有利弊,在实际工程中,要根据具体情况选用合适的方法,计算结果才比较可靠,才能保障工程建设顺利进行。
Earth volume calculation is one of the regular and essential work in engineering construction.In this paper,Three methods provided by Nan Fang CASS are used to calculate the earth volume of a test object,and the different results are analyzed.At the same time,the precision of the square grid method for earthwork calculation is analyzed theoretically.Due to the different calculation principles,each one of the three methods has its advantages and disadvantages.In the actual project,we should select the appropriate method according to the specific circumstances,then the result will be more reliable,and to ensure the smooth progressing of the construction project.
作者
吴清海
Wu Qinghai(School of Geodesy and Geomatics, Huaihai Institute of Technology, Lianyungang 222001, China)
出处
《工程勘察》
2017年第2期61-63,共3页
Geotechnical Investigation & Surveying