针对主蒸汽母管施工过程,运用系统工程和统筹法原理及多年的工程建设经验,在工程建设前期作好充分准备,在施工中严把安全质量关,竣工后作好试验、验收,确保了施工的全面受控。
For main steam pipeline construction, adequate preparations have made in early phrase based on many year' s construction experience via applying systems engineering and overall planning method principle. The strict quality control was implemented under construction, and good acceptance test was implemented after as-built so as to guarantee an overall control on the construction.
作者
张喜庆
ZHANG Xi-qing(Laiwu Energy and Power Plant of Shandong Iron & Steel Co., Ltd., Laiwu 271104)
出处
《冶金设备管理与维修》
2017年第1期65-66,共2页
Metallurgical Equipment Management and Maintenance
关键词
母管
材料
过程控制
Main pipe, material, process control