摘要
天津地铁五号线第七合同段在下穿北环铁路的过程中,遇到了较为复杂的地质条件,施工难度较大,故结合盾构穿越实际情况,阐述了盾构穿越施工的具体施工措施,并制订应急预案。
Tianjin Subway Line Contract 7, the next process through the North Central Railway, met a more complex geological conditions, construction difficult, this paper shield through the actual situation, elaborated through the construction of the concrete shield construction measures.
出处
《建筑技术开发》
2017年第1期97-98,共2页
Building Technology Development
关键词
地铁
盾构掘进
自动化监测.
subway
shield tunneling
automatic monitoring