悬索桥主梁更换施工控制关键技术及其力学分析 被引量:2

Key Techniques and Mechanics Analysis of Construction Control for Suspension Bridge Main Beam Replacement
下载PDF
导出
摘要 针对悬索桥主梁更换问题,以某山区悬索桥为例,分析并提出悬索桥主梁更换施工控制中的关键技术问题,并从力学角度对其加以分析验证,认为施工前全面测量、原桥恒载确定、更换过程中加劲梁节段间约束方式及时机确定、索鞍解锁及索塔偏位确定、吊杆可调长度确定、主缆承载力确定等对该桥更换主梁的施工控制十分关键。 Targeting at suspension bridge main beam replacement,this paper,with a suspension bridge in certain mountainous area is adopted as example,analyzed and suggested the key techniques of construction control for suspension bridge main beam replacement. Analysis and verification were made in view of mechanics,it is believed that overall measurement before construction,determined original bridge dead load,constraints between stiffening beam sections and timing determination,cable saddle unlock and cable tower offset determination,determination of adjustable boom length,the main cable bearing capacity,etc.are substantial to construction control of main beam replacement.
出处 《公路交通技术》 2017年第1期36-41,共6页 Technology of Highway and Transport
基金 交通运输部西部交通建设科技项目(2010318740008)
关键词 悬索桥 主梁 施工控制 力学分析 suspension bridge main beam construction control mechanical analysis
  • 相关文献

参考文献6

二级参考文献36

共引文献49

同被引文献12

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部