摘要
结合某高速公路桥梁的工程概况,以墩身混凝土配合比、滑模施工、钢筋连接绑扎、模板拆除等方面,阐述了桥梁高墩的施工技术要点,以确保高墩的工程质量,提升高速公路桥梁的整体建设成效。
Combining with the engineering survey of the bridge along some expressway,the paper illustrates the construction techniques of the bridge high pier from the pier concrete proportion ratio,slide mold construction,reinforced connection and binding,and mold demolition,so as to ensure the engineering quality of the high pier and promote the integral construction effect of the expressway bridges.
出处
《山西建筑》
2017年第3期150-151,共2页
Shanxi Architecture