西安地铁某区间土压平衡盾构掘进全断面砂层施工参数研究 被引量:3

Research on the Construction Parameters of Earth Pressure Balance Shield Tunneling in Full-section Sandy Layer in an Interval of Xi'an Subway
下载PDF
导出
摘要 以西安地铁4号线凤城九路站—凤城十二路站区间土压平衡盾构施工为背景,基于测试数据研究了土压平衡盾构在砂层中掘进参数及控制措施。现场情况表明:通过动态调整参数及渣土改良,使得盾构刀盘扭矩、掘进速度、出土量、注浆压力和注浆量分别控制在3 500~4 500k N·m,40mm/min,50~55m3,0.2~0.4MPa,4.86~6m3/环时,能够使土压平衡盾构较好地适应砂层。 Based on the construction process of the earth pressure balance shield tunneling between Fengcheng Ninth Road station and Fengcheng Twelfth Road station of Xi'an Subway Line 4,excavation parameters and control measurements in the construction of earth pressure balance shield tunneling are studied according to test data. Research results show that,earth pressure balance shield tunneling can be applied in sandy layer when shield cutter torque,excavation speed,volume of excavated earth,grouting pressure,and grouting volume are maintained between 3 500 k N·m to 4 500 k N·m,40 mm / min,50m^3to55m^3,0. 2MPa to 0. 4MPa,and 4. 86m^3 to 6m3respectively by means of soil improvement and dynamic parameter adjustment.
出处 《施工技术》 CAS 北大核心 2017年第5期109-112,共4页 Construction Technology
基金 陕西省自然科学基础研究计划项目(2016JQ5091)
关键词 地铁 土压平衡盾构 砂层掘进 掘进参数 沉降 subways earth pressure balance shield tunneling in sandy layer tunneling parameters settlement
  • 相关文献

参考文献5

二级参考文献26

共引文献105

同被引文献23

引证文献3

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部